March 07, 2016

Mechanical Acian True and Qualified

One cause cracked wall is less than perfect quality acian as written in previous articles that fix wall cracks, to prevent the wall cracking is the cost less than you fix, for the quality of the wall must mendaptkan attention, start to materials and work.

Although impressed easy and simple, the results pengacian on the wall (acian wall) is not as good as we thought. To obtain satisfactory results, you must pay attention to its process step by step carefully.


The first point acian wall you should notice is the stucco on the walls of the house will aci. Acian application is highly dependent on the quality of the stucco. Good quality plastering walls will generate acian good home anyway.

Plastering should be flat and smooth thus saving material acian wall. If the sand used to stucco-containing slurry is too high, it shrinks so that the plaster will crack resulting in cracked walls of the house.

Therefore before acian, plaster must be dry and there is no longer shrinking. Acian supposed to do on a stucco wall aged 2-3 weeks to the inner wall while the outer wall can be faster (2 weeks). If acian too quickly done, it can cause cracking in acian.

If the brick wall is very wet at the time of the stucco, then the water will be trapped so it takes a long time to remove the water. Instead of dry plaster surfaces also adversely affect the results of acian.

Before doing acian, wet the plaster surface with water. It is important to avoid acian or white dry mortar is not too fast. White cement in the mortar needs water for hydration process. If acian dry up too quickly then the results will acian acian soft and the surface will be dusty.

If the time required of the finished penghamparan acian until acian be polished about 20-30 minutes, then plastering enough moisture. But if less than 20 minutes means stucco too dry, and if more than 30 minutes means plastering too humid.

Bold acian also affect the quality of their results. Thick acian should be 1-3 mm. If less than 1 mm will dry too quickly. When the first layer is less than 1 mm, then prior to the first layer should be dry the next layer until at least 1 mm.

If there are a lot of holes in stucco then one day prior to acian, hole - the hole must be closed. If thick acian more than 3 mm, it must do two layers. Allow the first coat to dry for a few days recently performed the next layer.





Image Source Here
Sorry, the comment functionality to Mechanical Acian True and Qualified temporarily closed. Questions, suggestions or criticism please go to the Contact page.
 

TOP